Transmission End Cover ATF Feed Pipe Replacement (A/T)
Remove the snap ring (A), the 3rd clutch feed pipe (B), and the feed pipe
flange (C) from the end cover (D).
Install a new O-ring (E) over the 3rd clutch feed pipe.
In ...
A/T Housing Reverse Idler Gear Installation (A/T)
Lightly coat the reverse idler gear shaft (A), the needle bearing (B),
and new O-rings (C) with lithium grease.
Assemble the new O-rings and the needle bearing on the reverse ...
Edit Avoid Area
INFO button
► Setup ►Other
►Routing & Guidance►Edit Avoid Area
“Edit”
Specify up to five areas to avoid (e.g., road construction, closures), if
possible, when
t ...