M/T Differential Carrier/Final Driven Gear Replacement (M/T)
Loosen the bolts in a crisscross pattern in several steps, then remove
the final driven gear (A) from the differential carrier (B).
Install the final driven gear with the cham ...
Service Station Procedures
Refueling
1. Park with the driver’s side closest to the service station pump.
2. Outside of the vehicle, open the fuel fill door by pulling its notched edge.
3. Remove the fuel fill cap slowly. ...
Rocker Arm Assembly Installation
If the rocker arm assembly is disassembled, reassemble the rocker arm
assembly.
Apply engine oil to the end of the valve stem.
Install the rocker arm assembly.
...