PCV Valve Inspection
Remove the harness holder (A).
Check the PCV valve (A), the hoses (B), the pipe (C), and the connections
for leaks or restrictions.
At idle, make sure there is ...
Side Impact Sensor (Second) Replacement
Removal
Do the battery terminal disconnection procedure,
then wait at least 3 minutes before starting work.
Remove the cargo area side trim.
Disconnect the side ...
Secondary Shaft 2nd Gear Axial Clearance Inspection (A/T)
Install the thrust needle bearing (A), the needle bearing (B), 2nd gear
(C), the thrust needle bearing (D), the 43 x 54.5 mm thrust washer (E), the
39 mm cotters (F), and the cotter retain ...