Check for continuity in each direction, between the B terminal and P terminals, and between the E terminal and P terminals of each diode pair. All diodes should have continuity in only one direction. Because the rectifier diodes are designed to allow current to pass in one direction, and the rectifier is made up of six diodes (six pairs), you must test each diode in both directions for continuity with an ohmmeter that has diode checking capability: a total of 24 checks:
If any diode failed, replace the rectifier assembly. (Diodes are not available separately.)
If all the diodes are OK, go to step 19.
Headlight Bulbs
When replacing, use the following bulbs.
High/Low beam headlight: 60/55 W (HB2)
NOTICE
Halogen bulbs get very hot when lit.
Oil, perspiration, or a scratch on the glass can cause
the bulb to ov ...
Transmission End Cover Transmission Fluid Pressure Switch Replacement (A/T)
Remove the transmission fluid pressure switch A (2nd clutch) (A).
Make sure there is no water, oil, dust, or foreign particles inside the
connector.
Install the new tr ...
A/T Differential Carrier and Final Driven Gear Replacement (A/T)
Remove the final driven gear (A) from the differential carrier (B). The
final driven gear bolts have left-hand threads.
Install the final driven gear on the differential carri ...