Remove the under-cowl panel.
Disconnect the ignition coil connectors (A), then remove the ignition coils (B).

Remove the spark plugs, and inspect them.
Apply a small amount of anti-seize compound to the plug threads, and screw the plugs into the cylinder head, finger tight, then tighten the plugs to the specified torque.
|
Specified Torque |
|
18 NВ·m (1.8 kgfВ·m, 13 lbfВ·ft) |
Install all remaining parts in the reverse order of removal.
Reverse Shift Fork Clearance Inspection (M/T)
Measure the clearance between the reverse idler gear (A) and the reverse
shift fork (B) with a feeler gauge (C). If the clearance is more than the
service limit, go to step 2.
...
Installation (Part -2)
Set the front subframe (A) with the steering gearbox on the transmission jack and support it.
@font-face{font-family:
"Honda_SymbolMarkeng";src:url( ...
Calculating the Route
This section describes how to calculate your route.
1. Select Set as Dest.
► The system calculates and
displays the route line on the
map screen.
The following items are available:
• R ...