NOTE: Install the receiver/dryer as quickly as possible to prevent the system from absorbing moisture from the air.
Remove the A/C condenser.
Remove the bolts from the A/C condenser, then remove the receiver/dryer (A), the bracket (B), and the O-rings (C).
Install the receiver/dryer in the reverse order of removal. Replace the O-rings with new ones, and apply a thin coat of refrigerant oil (SP-10) before installing them. Be sure to use the correct O-rings for HFC-134a (R-134a) to avoid leakage.
Rerouting
INFO button
► Setup ►Other
►Routing & Guidance
Set whether route recalculation occurs automatically or manually during route
guidance.
Select an option.
The following op ...
Gauge Control Module Replacement
NOTE: Before replacing the gauge control module,
retrieve the ODO value and the maintenance minder information from
the gauge control module with the HDS.
Remove the instrument panel.
...
Front Individual Map Light Test/Replacement (With Navigation)
With navigation
Turn the individual map light switch OFF.
Carefully pry the lens (A) off with a small screwdriver.
Individual Map Light:
8 ...