Check that there is continuity between each lead (A):
If there is continuity, go to step 24.
If there is no continuity, replace the stator.
Check for continuity between each lead and the coil core (B):
If there is no continuity, go to step 25.
If there is continuity, replace the stator.
Cable Reel Replacement
Removal
Make sure the front wheels are aligned straight ahead.
Do the battery terminal disconnection procedure,
then wait at least 3 minutes before starting work.
...
Intermediate Shaft Reassembly (A/T)
Exploded View
Special Tools Required
Oil Seal Driver, 65 mm 07JAD-PL90100
Bearing Driver Attachment, 52 x 55 mm 07746-0010400
Bearing Driver Attachment, 35 mm I.D. 07746-0030400
Drive ...
Calculating the Route
This section describes how to calculate your route.
1. Select Set as Dest.
► The system calculates and
displays the route line on the
map screen.
The following items are available:
• R ...