Cable Reel Replacement
Removal
Make sure the front wheels are aligned straight ahead.
Do the battery terminal disconnection procedure,
then wait at least 3 minutes before starting work.
...
Change Lever Clearance Inspection (M/T)
Measure the clearance between the change lever (A) and the select lever
(B) with a feeler gauge (C). If the clearance is more than the service
limit, go to step 2.
...
Engine Does Not Start
Checking the Engine
If the engine does not start, turn the ignition switch to START
and check the
starter.
If you must start the vehicle immediately, use an
assisting vehicle to jump start it. ...