
Change Lever Clearance Inspection (M/T)
Measure the clearance between the change lever (A) and the select lever
(B) with a feeler gauge (C). If the clearance is more than the service
limit, go to step 2.
...
M/T Differential Carrier/Final Driven Gear Replacement (M/T)
Loosen the bolts in a crisscross pattern in several steps, then remove
the final driven gear (A) from the differential carrier (B).
Install the final driven gear with the cham ...
Shift Solenoid Valve Removal and Installation (A/T)
NOTE: Do not hold the solenoid valve connector to remove and install the
solenoid valve. Be sure to hold the solenoid valve body.
Remove the mounting bolts, then remove the solenoid valves by ...