Install a new front bearing in the drive-end housing with a hammer, the driver handle, 15 x 135L (A), and the bearing driver attachment, 42 x 47 mm (B).
Remove the stator (A).
Remove the terminal insulator (A) and the harness bracket (B).
Remove the voltage regulator/brush holder assembly (A) and the rectifier (B).
Electrical
...
Stator Test
Check that there is continuity between each lead (A):
If there is continuity, go to step
24.
If there is no continuity, replace the stator.
...
Secondary Shaft 2nd Gear Axial Clearance Inspection (A/T)
Install the thrust needle bearing (A), the needle bearing (B), 2nd gear
(C), the thrust needle bearing (D), the 43 x 54.5 mm thrust washer (E), the
39 mm cotters (F), and the cotter retain ...