Install a new front bearing in the drive-end housing with a hammer, the driver handle, 15 x 135L (A), and the bearing driver attachment, 42 x 47 mm (B).
Remove the stator (A).
Remove the terminal insulator (A) and the harness bracket (B).
Remove the voltage regulator/brush holder assembly (A) and the rectifier (B).
System Initialization
The navigation system must be initialized if
power to the navigation system is
interrupted for any reason (e.g., the
battery was disconnected). ...
Park Pin Switch Replacement (A/T)
NOTE: The park pin switch is installed in the shift lever bracket base, and
not available separately from the shift lever bracket base; replace the park pin
switch and the shift lever bracket base ...
Reporting Errors
You can help to improve database
accuracy by reporting any errors you
encounter.
• Report errors in freeways and main
“verified” roads shown in black on the
map at http://mapreporter.navteq ...