M/T Differential Backlash Inspection (M/T)
Place the differential assembly on V-blocks (A), and install the right
driveshaft (B) and the left driveshaft (C).
Measure the backlash of both pinion gears (D) with a dial in ...
Driving to Your Destination
This section describes how to follow the route guidance to your destination,
and
choose the icons displayed on the map screen. ...
Recirculation Control Cable Adjustment
Open the glove box. Release the glove box stop on each side, then
let the glove box hang down.
Set the recirculation control lever to FRESH ().
Detach the recirculation ...