Remove the harness holder (A).

Disconnect the hose (A).

Remove the PCV valve (B).
Install the parts in the reverse order of removal with a new 14 mm washer (C).
Break-in Period
Help assure your vehicle’s future reliability and performance by paying extra
attention to how you drive during the first 600 miles (1,000 km).
During this period:
• Avoid full-throttle starts ...
Water Pump Inspection
Remove the right front wheel.
Remove the splash shield.
Loosen the water pump pulley mounting bolts (A).
Remove the drive belt.
Remove the ...
A/T Differential Carrier and Final Driven Gear Replacement (A/T)
Remove the final driven gear (A) from the differential carrier (B). The
final driven gear bolts have left-hand threads.
Install the final driven gear on the differential carri ...