NOTE: Install the receiver/dryer as quickly as possible to prevent the system from absorbing moisture from the air.
Remove the A/C condenser.
Remove the bolts from the A/C condenser, then remove the receiver/dryer (A), the bracket (B), and the O-rings (C).
Install the receiver/dryer in the reverse order of removal. Replace the O-rings with new ones, and apply a thin coat of refrigerant oil (SP-10) before installing them. Be sure to use the correct O-rings for HFC-134a (R-134a) to avoid leakage.
Installation (Part -2)
Set the front subframe (A) with the steering gearbox on the transmission jack and support it.
@font-face{font-family:
"Honda_SymbolMarkeng";src:url( ...
Clutch Replacement (M/T)
Special Tools Required
Clutch Alignment Disc 07JAF-PM7011A
Clutch Alignment Shaft 07JAF-PM7012A
Clutch Alignment Shaft 07ZAF-PR8A100
Ring Gear Holder 07LAB-PV00100
Weight, Remover 07741-0010 ...
Engine Compression Inspection
NOTE: After the inspection, you must reset the ECM/PCM. Otherwise, the
ECM/PCM will continue to stop the injectors from operating.
Allow the engine to reach operating temperature (fan comes o ...