PCV Valve Inspection
Remove the harness holder (A).
Check the PCV valve (A), the hoses (B), the pipe (C), and the connections
for leaks or restrictions.
At idle, make sure there is ...
Fuel and Emissions System Description - PGM-FI System
PGM-FI System
The programmed fuel injection (PGM-FI) system is a sequential multiport
fuel injection system.
Alternator Control
The alternator signals the ECM/PCM during chargi ...
Secondary HO2S Replacement
Special Tools Required
O2 Sensor Wrench Snap-on S6176 or equivalent, commercially available
Disconnect the secondary HO2S connector (A).
Raise the vehicle on a lift.
...