'11-13 models
NOTE:
Put on gloves to protect your hands.
Take care not to scratch the door.
Remove the door panel.
Disconnect the power door lock actuator connector, and detach the harness clips.
Remove the plastic cover, as needed.
Raise the glass fully.
Remove the clip securing the pad (A), and release the hooks (B), then remove it.
Install the pad in the reverse order of removal.
When installing the door panel, make sure the plastic cover is installed properly and sealed around its outside perimeter to seal out water.
Secondary Shaft 2nd Gear Axial Clearance Inspection (A/T)
Install the thrust needle bearing (A), the needle bearing (B), 2nd gear
(C), the thrust needle bearing (D), the 43 x 54.5 mm thrust washer (E), the
39 mm cotters (F), and the cotter retain ...
Start-up
The navigation system starts automatically when you turn the ignition to
ACCESSORY (I) or ON (II). At start-up, the following Confirmation screen is
displayed.
1. Select Change Language.
► ...
Crankshaft Main Bearing Replacement
Main Bearing Clearance Inspection
Remove the bearing cap bridge, the main bearing caps, and main bearing
halves.
Clean each main journal and main bearing half with a clean s ...