NOTE:
When installing the drain bolt (A), always use a new washer.
When installing the sealing bolt(s) (B), always use a new bolt(s) and washer(s) (C).

Change Lever Clearance Inspection (M/T)
Measure the clearance between the change lever (A) and the select lever
(B) with a feeler gauge (C). If the clearance is more than the service
limit, go to step 2.
...
HVAC
...
PCV
Fuel and Emissions System Description - PCV System
Positive Crankcase Ventilation (PCV) System
The PCV valve prevents blow-by gasses from escaping into the atmosphere
by venting them into the ...