Special Tools Required
* Available through the Honda Tool and Equipment Program 888-424-6857.
Note these items during removal:
Use solvent and a brush, wash any oil and dirt off the end of the steering gearbox, but avoid any electrical parts. Blow dry with compressed air.
Lower the front subframe from the body then remove the steering gearbox.
Mainshaft Disassembly, Inspection, and Reassembly (A/T)
Inspect the thrust needle bearings and the needle bearings for galling
and rough movement.
Inspect the splines for excessive wear and damage.
Check the shaft bearing s ...
Customer Service Information
Honda dealership personnel are trained professionals. They should be able to
answer all your questions.
If you encounter a problem that your dealership does not solve to your satisfaction,
please ...
Secondary Shaft 2nd Gear Axial Clearance Inspection (A/T)
Install the thrust needle bearing (A), the needle bearing (B), 2nd gear
(C), the thrust needle bearing (D), the 43 x 54.5 mm thrust washer (E), the
39 mm cotters (F), and the cotter retain ...