M/T Differential Backlash Inspection (M/T)
Place the differential assembly on V-blocks (A), and install the right
driveshaft (B) and the left driveshaft (C).
Measure the backlash of both pinion gears (D) with a dial in ...
A/T Differential Carrier and Final Driven Gear Replacement (A/T)
Remove the final driven gear (A) from the differential carrier (B). The
final driven gear bolts have left-hand threads.
Install the final driven gear on the differential carri ...
Shifter Input and Linkage
Paddle Shifter (Downshift Switch) Replacement (A/T)
SRS components are located in this area. Review the SRS component locations
and the precautions and procedures before doi ...