PCV Valve Inspection
Remove the harness holder (A).
Check the PCV valve (A), the hoses (B), the pipe (C), and the connections
for leaks or restrictions.
At idle, make sure there is ...
Deleting a Paired Phone
PHONE button
► Phone Setup ► Add/Select a phone
1. Select List under Paired Phone
List.
2. Select a phone to delete.
► The Bluetooth® icon indicates
the currently lin ...
Change Lever Clearance Inspection (M/T)
Measure the clearance between the change lever (A) and the select lever
(B) with a feeler gauge (C). If the clearance is more than the service
limit, go to step 2.
...